Ramana Steels

Technology

How we size a container shear for a working yard

Press-box volume, blade gap and duty hours matter more than a headline horsepower figure. Here is the sequence our engineers use on site.

The Ramana Record

Ludhiana, India

By Engineering Desk

1 min read

Share

A container shear is specified from the feed backward, not from the brochure forward. We first weigh a typical grab, note the longest piece the crane can lift, and ask how many hours the shear will run between shifts.

Those three numbers set the press-box volume and the closing force. Horsepower is the last choice, not the first: it only has to keep the cycle time when the box is full of the heaviest mix the yard actually sees.

Foundations and power are checked in the same visit. A shear that is right on paper and wrong on the pad will spend its first year waiting for civil work.

Machines in this report

Back to the journal

Let's talk

Need a machine for your scrap yard or steel plant?

Tell us about your material and throughput. Our engineers will recommend the right model and send a detailed quotation.